Dots & Boxes Test Report

1.    Test Summary

 

This test was run by Donna Stidolph and witnessed by Al Gore.  The test was run on 22 October in JBE 105 using a personal computer running Windows NT, version xxx.  A total of 45 tests were run, of which 3 failed and 92 passed.  Of the failed tests, 2 were judged to be minor or cosmetic failures and 1 was judged to be major.  Based on these results we recommend acceptance of this product, with the understanding that all defects will be repaired no later than one month from the date of this test.

2.    Failure Summary Table

 

The following table list  the failed tests noted in the Test Summary.

Test Step

Description of Failure

Req Not Met

Assessment of Effect of Failure

4.4.2

Misspelling in error message for incorrect move.

7.3.2.2.a, 7.3.2.2.b

Minimal.  Minimal effort to repair.

4.3.1

Win condition correctly detected and reported, but final total score not summed.

7.2.1.3,

7.3.1.3

Minimal.  Minimal effort to repair.

4.6.8

When game is exited with help window open, help window is not closed.

7.1.2.1

Major.  Minimal effort to repair.

 

Name                          Signature                                Date

Donna Stidolph                                                           10/22/01